positive post

The loss of the cobb; the slow inevitable draining of the dams; old batteries that aren’t recharging well (thus, a lack of power) are things that make us realise the difficulty we have put ourselves into. Some days are indeed difficult – but wwhose life is easy? We try to focus on the positives: an […]

Kersplatt

This is sad. Do not laugh. It sums things up for now. After a night of thunder and lightening (remember: such weather events are rare in Tasmania) and close to 100mm in one night (I kid you not – I sort of measured it) our beloved Cobb oven went kerplunk. It is sad for me, […]

Post #100

Yay! We celebrate post #100 with a few exciting details on our progress at Fangorn! Firstly, the title (“Post”) is quite fitting today as today is the day we’re expecting to raise our first house post! It will be a two-man effort (or at least one man and one woman), with the posts being very […]

Cobb #3

Apologies again for the lateness of my post on the cobb oven! Whilst this has been a ‘feature’ of our little bit of cabin-site for some months now, I haven’t posted about it. Despite being incomplete, the cobb oven is very sturdy. To give you an idea how strong it is, Matthew can stand on […]

Ten Years

Monte and I got married ten years ago! Our wedding day: Feb 6 1999 Monte’s father wrote a beautiful poem for us, which left us both speechless! The Foundation – by Gordon Goulding The foundation is laid! Ten years of loving care Locked into place with steel Meshed with memories and ties Of firm and […]

The Slab and other goodies

There’s a great deal going on so it’s hard to work out what to report on first! I choose to report on the slab. Here is a photo of our children running along on the slab (looking north-east). We were out one sunny morning to water it down so it didn’t dry out and then […]

Concrete and Septic

We’re really excited that we now have a concrete slab! It was 0630 on a cold, wet and foggy Monday morning when the concreters arrived with a pump truck, and throughout the morning 9 concrete trucks made it up our hilly driveways and the slab was made! It took an entire morning to pour the […]